Conservation Measures
In 1976 and 1991 the instable slope at the western abutment Pusserein required structural measures new supports and later floating bearings to be carried out. In 1997/98, the Salginatobel Bridge was comprehensively repaired and restored. The heavily damaged parapets had to be completely replaced and the deck received a special waterproofing. The entire surface of the arch slab as well as the side walls and cross walls were freed of the damaged patches using ultra-high pressure water jets and were lined with a thin layer of spray mortar. The subsequent reconstruction of the formwork pattern aided by photographic documentation proved to be very demanding. The total expenditure of the restauration amounted to two million Swiss Francs.